# Mode B — Sync a Configured Provider Re-syncs an already-*Configured* test provider on a DevOps Center pipeline so that suites added to the provider since it was last configured become available for assignment to stages. **Confirmation required:** Yes — explicit confirmation before the sync is triggered. ## Inputs | Variable | Source | |---|---| | `doce-org-alias` | Prerequisite 1 | | `pipelineId` | Prerequisite 4 (pipeline selection) | | `testProviderId` | Resolved by fetching the pipeline's test providers (Step 1 below) | Prerequisite 5 (stage) is **not** required — providers are synced at the pipeline level. --- ## Step 1 — Fetch test providers to resolve the provider ID ```bash sf api request rest \ "/services/data/v67.0/connect/devopstesting/pipeline//testProviders?status=all" \ --target-org ``` Each provider entry includes `testProviderId`, `testProviderName`, and a status (Configured vs. Available). Present a short summary grouped by status (same format as Mode A). - **Only a Configured provider can be synced.** If the user names an *Available* (not-yet-configured) provider, explain it must be configured first — use **Mode A** (`references/configuring-test-provider.md`). - If the pipeline has no configured providers, report that and stop — do NOT fabricate a provider or ID. ## Step 2 — Confirmation gate **Required — do not call the API before the user confirms.** > "I'll re-sync `` on the `` pipeline to pick up any new suites. Confirm?" Do not proceed until the user gives an affirmative response. ## Step 3 — Trigger the sync On confirmation, call the sync endpoint with the provider ID(s) and pipeline ID: ```bash sf api request rest \ "/services/data/v67.0/connect/devops/sync" \ --method POST \ --body '{ "testProviderIds": [""], "pipelineId": "" }' \ --target-org ``` `testProviderIds` is a list — multiple configured providers can be synced in one call. ## On success > "Provider `` sync started. The operation is running asynchronously — new suites will be available shortly." The sync runs asynchronously; newly synced suites can then be assigned to stages with `dx-devops-test-suite-assignments-configure`. --- ## Critical gotcha **Do NOT use** `POST /connect/devops/pipeline//testProvider` to sync — that endpoint **creates a new provider configuration** and will result in duplicate `DevopsPipelineTestProvider` records. Sync only via `POST /connect/devops/sync`. See `references/gotchas.md`. See `references/error-handling.md` for status-code responses.