* ci: update package details and add GitHub workflows for skills validation and release * chore: update Node version, change license, and refactor skills validation script to TypeScript * chore: remove unused deps * fix: npm package * fix: flatten skills to pass validation * chore: add validation script to package.json and update GitHub workflow to use it * chore: enhance skills validation and update workflows for npm publishing * refactor: streamline skills validation process in workflow and script * refactor: improve documentation and structure of skills validation script * implement checks based on jeff's best practices doc * chore: add pull request template for skill submissions * chore: update pull request template with additional references and improve automated checks section * chore: update pull request template to clarify naming convention with a warning for gerund form * chore: update pull request template to reference skill authoring guide and enhance checklist structure * chore: enhance GitHub workflows for skills validation and release process * refactor: improve parsing logic for SKILL.md files and enhance error collection in validation * chore: update validation checks to enforce character limits for skill names and descriptions * fix: remove unnecessary whitespace in footer string in validate-skills.ts
309 lines
8.2 KiB
Markdown
309 lines
8.2 KiB
Markdown
# Rollback Procedures
|
|
|
|
This guide provides step-by-step instructions for rolling back a Salesforce deployment if issues are discovered after release.
|
|
|
|
## When to Rollback
|
|
|
|
Execute a rollback when:
|
|
- **Critical functionality is broken** and cannot be hotfixed quickly
|
|
- **Data integrity issues** are discovered
|
|
- **Performance degradation** exceeds 50% of baseline
|
|
- **Security vulnerabilities** are introduced
|
|
- **Stakeholder approval** to rollback is obtained
|
|
|
|
Do NOT rollback for:
|
|
- Minor UI issues that don't impact functionality
|
|
- Issues that can be hotfixed in < 2 hours
|
|
- Edge cases affecting < 5% of users
|
|
- Cosmetic problems
|
|
|
|
## Pre-Rollback Checklist
|
|
|
|
Before initiating rollback:
|
|
|
|
- [ ] Confirm the issue severity justifies rollback
|
|
- [ ] Obtain stakeholder approval
|
|
- [ ] Notify all users of upcoming rollback
|
|
- [ ] Backup current production state (post-deployment)
|
|
- [ ] Verify pre-deployment backup is available
|
|
- [ ] Review rollback plan with team
|
|
- [ ] Prepare communication for completion
|
|
|
|
## Rollback Methods
|
|
|
|
### Method 1: Redeploy Previous Version (Recommended)
|
|
|
|
**Best for**: Metadata-only deployments with no data changes.
|
|
|
|
**Steps**:
|
|
|
|
1. **Retrieve pre-deployment state from version control**:
|
|
```bash
|
|
git checkout pre-deployment-YYYYMMDD
|
|
```
|
|
|
|
2. **Validate rollback deployment**:
|
|
```bash
|
|
sf project deploy validate \
|
|
--manifest manifest/package.xml \
|
|
--test-level RunLocalTests \
|
|
--target-org production
|
|
```
|
|
|
|
3. **Deploy previous version**:
|
|
```bash
|
|
sf project deploy start \
|
|
--manifest manifest/package.xml \
|
|
--test-level RunLocalTests \
|
|
--target-org production
|
|
```
|
|
|
|
4. **Verify rollback**:
|
|
- Test critical user flows
|
|
- Check for errors in debug logs
|
|
- Confirm with stakeholders
|
|
|
|
**Timeline**: 30-60 minutes
|
|
|
|
### Method 2: Selective Component Rollback
|
|
|
|
**Best for**: When only specific components are problematic.
|
|
|
|
**Steps**:
|
|
|
|
1. **Identify problematic components**:
|
|
- Review error logs
|
|
- Isolate failing functionality
|
|
- List components to rollback
|
|
|
|
2. **Create targeted package.xml**:
|
|
```xml
|
|
<?xml version="1.0" encoding="UTF-8"?>
|
|
<Package xmlns="http://soap.sforce.com/2006/04/metadata">
|
|
<types>
|
|
<members>ProblematicClass</members>
|
|
<name>ApexClass</name>
|
|
</types>
|
|
<version>59.0</version>
|
|
</Package>
|
|
```
|
|
|
|
3. **Retrieve previous version of components**:
|
|
```bash
|
|
git show pre-deployment-YYYYMMDD:force-app/main/default/classes/ProblematicClass.cls > temp/ProblematicClass.cls
|
|
```
|
|
|
|
4. **Deploy only those components**:
|
|
```bash
|
|
sf project deploy start \
|
|
--manifest rollback-package.xml \
|
|
--target-org production
|
|
```
|
|
|
|
**Timeline**: 15-30 minutes
|
|
|
|
### Method 3: Destructive Changes
|
|
|
|
**Best for**: When new components must be removed entirely.
|
|
|
|
**Steps**:
|
|
|
|
1. **Create destructiveChanges.xml**:
|
|
```xml
|
|
<?xml version="1.0" encoding="UTF-8"?>
|
|
<Package xmlns="http://soap.sforce.com/2006/04/metadata">
|
|
<types>
|
|
<members>NewComponentToDelete</members>
|
|
<name>ApexClass</name>
|
|
</types>
|
|
<version>59.0</version>
|
|
</Package>
|
|
```
|
|
|
|
2. **Create empty package.xml**:
|
|
```xml
|
|
<?xml version="1.0" encoding="UTF-8"?>
|
|
<Package xmlns="http://soap.sforce.com/2006/04/metadata">
|
|
<version>59.0</version>
|
|
</Package>
|
|
```
|
|
|
|
3. **Deploy destructive changes**:
|
|
```bash
|
|
sf project deploy start \
|
|
--manifest package.xml \
|
|
--pre-destructive-changes destructiveChanges.xml \
|
|
--test-level RunLocalTests \
|
|
--target-org production
|
|
```
|
|
|
|
4. **Verify deletion**:
|
|
```bash
|
|
sf org list metadata --metadata-type ApexClass --target-org production
|
|
```
|
|
|
|
**Timeline**: 20-40 minutes
|
|
|
|
## Data Rollback Considerations
|
|
|
|
If the deployment included data changes:
|
|
|
|
### Option A: Restore from Backup
|
|
|
|
1. **Locate pre-deployment data backup**:
|
|
- Data Export Service snapshot
|
|
- Backup tool (OwnBackup, Spanning, etc.)
|
|
- Manual CSV exports
|
|
|
|
2. **Restore data**:
|
|
```bash
|
|
sf data import tree --plan data-backup/data-plan.json --target-org production
|
|
```
|
|
|
|
3. **Validate data integrity**:
|
|
- Run data quality checks
|
|
- Verify record counts
|
|
- Check relationships
|
|
|
|
**Timeline**: 1-4 hours (depending on data volume)
|
|
|
|
### Option B: Reverse Data Changes (Scripted)
|
|
|
|
1. **Identify affected records**:
|
|
```bash
|
|
sf data query --query "SELECT Id FROM Account WHERE LastModifiedDate >= YESTERDAY"
|
|
```
|
|
|
|
2. **Apply reverse operations**:
|
|
- Create Apex script to reverse changes
|
|
- Test in sandbox first
|
|
- Execute in production
|
|
|
|
**Timeline**: 2-6 hours
|
|
|
|
## Post-Rollback Steps
|
|
|
|
After rollback is complete:
|
|
|
|
1. **Verify Functionality**:
|
|
- [ ] Execute smoke tests
|
|
- [ ] Confirm critical workflows work
|
|
- [ ] Check automation (triggers, flows) operates correctly
|
|
- [ ] Review debug logs for errors
|
|
|
|
2. **Communication**:
|
|
- [ ] Notify users rollback is complete
|
|
- [ ] Send post-mortem summary to stakeholders
|
|
- [ ] Update status page / internal wiki
|
|
|
|
3. **Root Cause Analysis**:
|
|
- [ ] Document what went wrong
|
|
- [ ] Identify why issues weren't caught pre-deployment
|
|
- [ ] Update deployment checklist to prevent recurrence
|
|
- [ ] Schedule retrospective with team
|
|
|
|
4. **Next Steps**:
|
|
- [ ] Fix issues in development environment
|
|
- [ ] Add test cases to catch similar issues
|
|
- [ ] Re-validate deployment in sandbox
|
|
- [ ] Schedule new deployment with fixes
|
|
|
|
## Emergency Contacts
|
|
|
|
**Production Issues**:
|
|
- On-call DevOps: [contact info]
|
|
- Salesforce Support: [premier support phone]
|
|
- Release Manager: [contact info]
|
|
|
|
**Stakeholder Notifications**:
|
|
- Product Owner: [contact info]
|
|
- Business Analyst: [contact info]
|
|
- Executive Sponsor: [contact info]
|
|
|
|
## Rollback Decision Matrix
|
|
|
|
| Severity | Impact | Rollback? | Timeline |
|
|
|----------|--------|-----------|----------|
|
|
| **Critical** | >50% users affected, core functionality broken | Yes | Immediate (< 1 hour) |
|
|
| **High** | 10-50% users affected, workaround exists | Consider | Within 2-4 hours |
|
|
| **Medium** | <10% users affected, non-critical features | No, hotfix instead | Plan fix for next release |
|
|
| **Low** | Edge case, cosmetic issues | No | Address in backlog |
|
|
|
|
## Lessons Learned Template
|
|
|
|
After each rollback, document lessons learned:
|
|
|
|
```markdown
|
|
# Rollback Post-Mortem: [Date]
|
|
|
|
## Deployment Summary
|
|
- Deployment date/time: [timestamp]
|
|
- Components deployed: [list]
|
|
- Rollback date/time: [timestamp]
|
|
- Rollback method used: [method]
|
|
|
|
## Issue Description
|
|
[Describe what went wrong]
|
|
|
|
## Root Cause
|
|
[Why did the issue occur?]
|
|
|
|
## Detection
|
|
- How was the issue discovered?
|
|
- How long after deployment?
|
|
- Who reported it?
|
|
|
|
## Impact
|
|
- Number of users affected: [count]
|
|
- Business processes impacted: [list]
|
|
- Duration of impact: [timespan]
|
|
|
|
## Resolution
|
|
- Rollback timeline: [start - end]
|
|
- Additional fixes required: [list]
|
|
|
|
## Prevention
|
|
- What tests would have caught this?
|
|
- Process improvements needed:
|
|
- Deployment checklist updates:
|
|
|
|
## Action Items
|
|
- [ ] [Action item with owner]
|
|
- [ ] [Action item with owner]
|
|
```
|
|
|
|
## Best Practices
|
|
|
|
1. **Practice rollbacks in sandbox** - Don't wait for an emergency to learn the process
|
|
2. **Maintain detailed backups** - Automate metadata and data backups before every deployment
|
|
3. **Use version control tags** - Tag every production deployment for easy identification
|
|
4. **Document everything** - Keep a deployment log with timestamps and decisions
|
|
5. **Communicate proactively** - Keep stakeholders informed throughout the process
|
|
6. **Set time limits** - If rollback takes >2 hours, consider alternative approaches
|
|
7. **Test the rollback** - Validate in sandbox that the rollback process works
|
|
|
|
## Rollback Scripts Repository
|
|
|
|
Keep commonly-used rollback scripts in version control:
|
|
|
|
```
|
|
scripts/rollback/
|
|
├── rollback-apex.sh # Rollback Apex classes
|
|
├── rollback-lwc.sh # Rollback Lightning Web Components
|
|
├── rollback-flows.sh # Rollback flows and processes
|
|
├── rollback-data.sh # Restore data from backup
|
|
└── verify-rollback.sh # Post-rollback verification
|
|
```
|
|
|
|
## Testing Rollback Procedures
|
|
|
|
**Quarterly rollback drill**:
|
|
1. Deploy a test change to sandbox
|
|
2. Wait 1 hour
|
|
3. Execute full rollback procedure
|
|
4. Time the process
|
|
5. Document any issues
|
|
6. Update procedures as needed
|
|
|
|
This ensures the team is prepared when a real rollback is needed.
|