Mode A — Configure a Test Provider
Configures an Available (not-yet-configured) test provider on a DevOps Center pipeline, making its test suites available for assignment to pipeline stages.
Confirmation required: Yes — explicit confirmation before the provider is configured.
Inputs
| Variable | Source |
|---|---|
doce-org-alias |
Prerequisite 1 |
pipelineId |
Prerequisite 4 (pipeline selection) |
testProviderId |
Resolved by fetching the pipeline's test providers (Step 1 below) |
Prerequisite 5 (stage) is not required — providers are configured at the pipeline level.
Step 1 — Fetch test providers to resolve the provider ID
sf api request rest \
"/services/data/v67.0/connect/devopstesting/pipeline/<pipelineId>/testProviders?status=all" \
--target-org <doce-org-alias>
Each provider entry includes testProviderId, testProviderName, and a status (Configured vs. Available). Present a short summary grouped by status:
Test providers for <pipelineName>:
✓ Configured:
- Code Analyzer (63 suites)
- Apex Unit Tests (5 suites)
Available (not yet configured):
- Flow Tests
- Only an Available provider can be configured. If the pipeline has no available providers, report that and stop — do NOT fabricate a provider or ID.
If the named provider is already Configured
Do not present the confirmation gate and do not POST to the configure endpoint (Steps 2–3) — that would create a duplicate DevopsPipelineTestProvider. Instead:
- State plainly that the provider is already configured, including its synced suite count and last-sync time if returned (e.g. "Flow Tests is already configured on
<pipelineName>with 3 suites synced (last sync 2026-06-23)."). - Diagnose the user's actual goal and redirect by name:
- If the user says the provider's suites don't appear when assigning tests to a stage, this is a stage-assignment gap, not a provider-configuration gap — the suites already exist at the pipeline level; they just need to be linked to the stage. Redirect to
dx-devops-test-suite-assignments-configure. - If the user expects newly created suites that aren't yet synced, use Mode B — Sync a configured provider (
references/syncing-test-providers.md) to pull them in.
- If the user says the provider's suites don't appear when assigning tests to a stage, this is a stage-assignment gap, not a provider-configuration gap — the suites already exist at the pipeline level; they just need to be linked to the stage. Redirect to
- Do not loop back to configuring — finish cleanly after the explanation and redirect.
Step 2 — Confirmation gate
Required — do not call the API before the user confirms.
"I'll configure
<testProviderName>on the<pipelineName>pipeline. This will make its suites available for assignment to stages. Confirm?"
Do not proceed until the user gives an affirmative response.
Step 3 — Configure the provider
On confirmation, call the configure endpoint with the provider ID:
sf api request rest \
"/services/data/v67.0/connect/devops/pipeline/<pipelineId>/testProvider" \
--method POST \
--body '{"testProviderId": "<testProviderId>"}' \
--target-org <doce-org-alias>
On success
"Provider
<testProviderName>is now configured on the<pipelineName>pipeline. Its suites are available for assignment to stages."
Newly configured suites can then be assigned to stages with dx-devops-test-suite-assignments-configure.
See references/gotchas.md for the duplicate-provider trap and references/error-handling.md for status-code responses.